Bend-by-bend planning
The curtain weight, number of bends, bend radius and complete travel path are reviewed together.
Loading TrackFit...
Bays and bends
Motorised curtain tracks for bay windows, curved walls and complex layouts, professionally planned and installed.

System overview
Curves increase resistance and must be included in motor planning. TrackFit applies a preliminary 10% additional load allowance per bend and confirms the exact geometry before manufacture.
The curtain weight, number of bends, bend radius and complete travel path are reviewed together.
Forest FMS and FMS Plus can be bent or reverse-bent for suitable project layouts.
Shuttle iOn can be considered for suitable curved tracks with up to two bends.
Templates, measurements and fixing structure must be confirmed before production.
01 · Curtain
Use the finished curtain weight, not a rough fabric estimate. Include fullness, lining, interlining, heading and accessories.
02 · Track
Track length, bends, opening direction, stack position, brackets and fixing support all affect the installation.
03 · Controls
Power, app, voice, remote and building automation requirements should be agreed before the system is ordered.
Continue exploring
Electric and motorised curtain tracks designed for bay windows and curved domestic openings.
Open guide →Rechargeable Forest Shuttle iOn curtain motor for curtains up to 25 kg and suitable tracks up to 8 metres straight.
Open guide →Forest FMS motorised curtain track for straight, curved, wall-fixed and ceiling-fixed installations.
Open guide →Many Forest Shuttle systems include Touch Control and emergency manual operation. The exact feature set depends on the selected motor and control arrangement.
Yes, subject to survey, bend geometry, curtain load and final manufacturer specification. TrackFit uses a preliminary 10% additional planning allowance per bend when assessing motor load.
TrackFit can review the opening, curtain load, track profile, fixing, power location and controls before supplying and installing the agreed system.
Preliminary guidance
Published limits generally apply to stated configurations. Curves, track length, curtain construction and controls require project-specific confirmation.
Start your project enquiry →